If NPV and DCF rule says: 1$ today worth more than 1$ tomorrow, why would some mines want to blend direct feed ore from 0.7% to 0.35% and have constant feed grade? Apart from rehandling cost, it also adds losses in
For pit dewatering purposes would you design catch bench flat and let water flow down to below benches potentially eroding crest or would design it with 1-2% incline to the wall and have water sitting on the bench a